Suck UK – Top Drawer Autumn 2023

ClientSuck UK
EventTop Drawer Autumn 2023
VenueLondon Olympia

Project Details

Sat on a very large 98sqm stand space this Suck UK was built in 30+ degree heat, the day after taking the very same stand down and transporting it from the Autumn Fair in Birmingham. It featured:

  • 7m(w) x 4m(h) back wall (double sided).
  • free-standing central wall structure built using modular tension fabric frames.
  • Large double-sided display units at the front of the stand space.
  • Back-lit display boxes (Smiley, Stormtroopers and Guinness world records).
  • Suspended lighting rig with 40 LED flood lights.
×
×

Hello!

Click one of our contacts below to chat on WhatsApp

× Speak to us