Mitie – Security Event 2021

ClientMitie
EventRetail Risk
VenueLeicester City Football Club

Project Details

With just 3 hours to build this stand Pinnacle had to come up with a design that was quick and easy to install, but had maximum impact. All walls were pre-built and fitted into a sprinter van, the only thing that slowed the build was access with the tension fabric aluminium framework needing to be carried up two flights of stairs. The stand features:

  • Large tension fabric graphics.
  • 3 wall mounted 50″ TVs.
  • Ceiling panels with downlights.
  • Product demonstration of intelligent CCTV camera connected to one of the TVs.
×
×